Optimal Scheduling for Automated Wetetch Stations with One Robot in Semiconductor Manufacturing via Constraint Answer Set Programming
Carmen Leticia García-Mata, Larysa Burtseva, Frank Werner
- 发表年份
- 2024
- 引用次数
- 2
- 访问权限
- 开放获取
摘要
Scheduling and optimization have a central place in the research area of computing because it is increasingly important to achieve fully automated production processes to adjust manufacturing systems to the requirements of Industry 4.0. In this paper, we demonstrate how an automated wet-etch scheduling problem for a semiconductor industry can be solved by constraint answer set programming (CASP) and, its solver called clingcon. The considered scheduling problem includes a robot for lot transfers between the baths. CASP is a hybrid approach in automated reasoning that combines different research areas such as answer set programming, Constraint Processing and Satisfiability Modulo Theories. For a long time, exact methods such as constraint programming have displayed difficulties in solving real large-scale problem instances. Currently, the performance of state-of-the-art constrains solvers is comparatively better than a decade ago, and some complex combinatorial problems can be optimally solved. These theoretical and technical achievements open new horizons for declarative programming applications such as logistics. A successful solution to this problem is achieved and we found that in most cases tested, CASP is faster and obtains in most cases similar makespan values than solutions based on mixed integer linear programming and constraint paradigms.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991