An optimum metamodel for safety control of operational subway tunnel during underpass shield tunneling
Junru Zhang, Xin-ming Gou
- 发表年份
- 2018
- 引用次数
- 17
摘要
The settlement is regarded as an important index in underground engineering. When tunneling under across the operational subway tunnel, settlement of the operational tunnel should be monitored. To control the tunneling-induced movement of the operational subway tunnel, the operation parameters of mechanized-tunneling, namely, face and grout pressures, should be kept in a specific range. A hybrid approach is proposed utilizing uniform design method, and radial basis function neural network to develop the relation of settlement and related influential factors. Such connection is used as a tuning module for tunneling boring machine (TBM). Furthermore, implementing total station robot and soft computing method of support vector machine (SVM), a forecast model for settlement of the rail is established. The prediction tool SVM is improved by using the particle swarm optimization. Parameters c and g from the SVM and γ in the kernel function of the SVM are optimized using the particle swarm optimization. An illustrative case in Changsha Metro Line 3 constructing under the Metro Line 1 tunnel validates the prediction model. The feasibility of the metamodel is demonstrated by means of the example.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991
A new optimizer using particle swarm theory
R.C. Eberhart, James Kennedy
2002