Home /Research /A Study on Hybrid Force/ Motion Control for Automated Robotic Building Maintenance System
OTHER

A Study on Hybrid Force/ Motion Control for Automated Robotic Building Maintenance System

Seunghoon Lee, Min-Sung Kang, Jing Wu, Kyushik Shin, A. E. Traver, Chang-soo Han

Year
2011
Citations
2
Access
Open access

Abstract

Compared with the method of predicting the detailed construction cost based on the information of the detailed quantities derived from the completed work drawings and specifications, the method of predicting the approximate estimate based on facility specification or approximate design information, etc. at the stage before the drawings and specifications are completed tends to rely greatly on the subjective judgment of the person in charge of construction cost prediction, which is low in its objectivity accordingly.

Keywords

FacadeRobotComputer scienceDownloadMotion (physics)Motion controlControl systemEngineeringSimulationArtificial intelligence

Related papers

Browse all OTHER papers