OTHER
Production-logistics cooperative scheduling in a two-stage assembly flow-shop with deteriorating robotic arm: a problem-specific heuristic
Wenyu Zhang, Zihao Luo, Shuai Zhang
- Year
- 2026
- Citations
- 2
Keywords
Job shop schedulingScheduling (production processes)HeuristicAutomationRobotConstraint (computer-aided design)Mobile robotFlexible manufacturing system
Related papers
OTHER
📊 26,957 cites
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 cites
Artificial intelligence: a modern approach
1995
OTHER
Open access📊 20,501 cites
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 cites
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991