Planning of Available Resources Considering Ergonomics Under Deterministic Highly Variable Demand
Marco Bonini, Jan Schuhmacher, Augusto Urru, Jan Philipp Wezel, Vera Hummel, Wolfgang Echelmeyer
- Year
- 2020
- Citations
- 4
Abstract
In this paper, a method for hybrid short- to long-term planning of available resources for operations is presented, which is based on a known or deterministically forecasted but highly variable demand. The method considers quantitative measures such as the performance and the availability of resources, ergonomically relevant KPI and ultimately process costs in order to serve as a pragmatic planning tool for operations managers in SMEs. Specifically, the method enables exploiting the ergonomic advantages of available flexible automation technology (e.g. AGVs or picking robots), while assuring that these do not represent a capacity bottleneck. After presenting the method along with the necessary assumptions, mainly concerning the availability of data for the calculations, we report a case study that quantifies the impact of throughput variability on the selection of different process alternatives, where different teams of resources are used.
Keywords
Related papers
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991