Multi-Objective Optimal Model for Task Scheduling and Allocation in a Two Machines Robotic Cell Considering Breakdowns
Bahareh Vaisi, Hiwa Farughi, Sadigh Raissi
- 发表年份
- 2020
- 引用次数
- 2
- 访问权限
- 开放获取
摘要
This paper aimed to demonstrate a metaheuristic as a solution procedure to schedule a two-machine, identical parts robotic cell under breakdown. The proposed previous model enabled one to determine optimal allocation of operations to the machines and corresponding processing times of each machine. For the proposed mathematical model to minimize cycle time and operational cost, multi-objective particle swarm optimization (MOPSO) algorithm was provided. Through some numerical examples, the optimal solutions were compared with the previous results. MOPSO algorithm could find the solutions for problems embeds up to 50 operations in a rationale time.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991
A new optimizer using particle swarm theory
R.C. Eberhart, James Kennedy
2002