OTHER
Due Date Assignment and JIT Scheduling Problem in Blocking Hybrid Flow Shop Robotic Cells with Multiple Robots and Batch Delivery Cost
Javad Rezaeian, N. Derakhshan, Iraj Mahdavi, Reza Alizadeh Foroutan
- Year
- 2021
- Citations
- 2
Abstract
In this paper, just-in-time scheduling problem with batch delivery and due date assignment for hybrid flow shop robotic cells is considered. A mixed integer linear programming (MILP) model is presented to determine the sequence of jobs and robot moves. Two meta-heuristic algorithms including Artificial Immune System (AIS) and Tabu Search (TS) are proposed. The results show that AIS performs well for this problem.
Keywords
Tabu searchJob shop schedulingMathematical optimizationFlow shop schedulingInteger programmingRobotScheduling (production processes)MathematicsDue dateComputer science
Related papers
OTHER
📊 26,957 cites
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 cites
Artificial intelligence: a modern approach
1995
OTHER
Open access📊 20,501 cites
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 cites
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991