OTHER
Flow Shop Scheduling Problem with Transportation Times, Two-Robots and Inputs/Outputs with Limited Capacity
Tarik Lamoudan, Fatima El Khoukhi, A. El Alaoui, Jaouad Boukachour
- Year
- 2012
- Citations
- 7
- Access
- Open access
Abstract
In this paper we study a generalized flow-shop problem with two identical transport robots between machines. Besides transportation times for the jobs, empty moving times for the robots are taken into account. The objective is to minimize the Makespan.
Keywords
Scheduling (production processes)Flow shop schedulingComputer scienceRobotFlow (mathematics)Operations researchJob shop schedulingOperations managementEngineeringMathematics
Related papers
OTHER
📊 26,957 cites
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 cites
Artificial intelligence: a modern approach
1995
OTHER
Open access📊 20,501 cites
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 cites
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991