Proceedings of the 20th International Symposium on Automation and Robotics in Construction ISARC 2003 -- The Future Site
Ir De Leeuw, Kombinatie Middelplaat, W. Schermerhorn Ir., Middelplaat Oele Qhse-Officer Kombinatie
- 发表年份
- 2003
- 引用次数
- 3
- 访问权限
- 开放获取
摘要
Terneuzen-On the 14th of March 2003, the Westerschelde Tunnel was opened after a construction phase of five and a half years.The tunnel was constructed using modern technologies which were partially supported by software and other automated equipment.It's uncommon to use highly automated technologies in construction projects because the unique character of projects reduces the economic feasibility of implementing automated techniques.In this article the following automated techniques will be described: measurement systems to measure the deviations of the used segments and the positioning of the Tunnel Boring Machine (TBM), and monitoring techniques with regard to the temporary frozen soil, which will be described in this paper.The saturation diving technique will also be described.The first part of this paper deals with the scope of the project and specific experiences gathered during the construction phase.The second part will deal with the automation techniques used will be described and finally a presentation of the conclusions will be made.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991