首页 /研究 /Mars 2020 sampling and caching subsystem environmental development testing and preliminary results
OTHER

Mars 2020 sampling and caching subsystem environmental development testing and preliminary results

Lauren E. Chu, Kyle Brown, Kristo Kriechbaum

发表年份
2017
引用次数
4

摘要

The Environmental Development Testing program supported the development test efforts of the Mars 2020 Sampling and Caching Subsystem from May to November 2015. The engineering prototype Brassboard Corer was attached to a five degree-of-freedom robotic arm to execute a 96-test matrix of ambient and low pressure tests in the 10 ft. thermal vacuum chamber at the NASA Jet Propulsion Laboratory, California Institute of Technology. The Pretest, Test, and Post Test procedures are described, and some preliminary results are discussed. Data and observations from this test campaign inform the future development of the software and hardware toward the Mars 2020 flight design, including the next iteration of the rock coring drill, the Engineering Development Unit Corer.

关键词

Mars Exploration ProgramCoringJet propulsionDrillEnvironmental testsTest (biology)PropulsionSampling (signal processing)Computer scienceExploration of Mars

相关论文

查看 OTHER 分类全部论文