首页 /研究 /ROBOT SCHEDULING IN A CIRCUIT BOARD PRODUCTION LINE:A HYBRID OR/ANN APPROACH
LEARNING

ROBOT SCHEDULING IN A CIRCUIT BOARD PRODUCTION LINE:A HYBRID OR/ANN APPROACH

Yuehwern Yih, Ting‐Peng Liang, HERBERT MOSKOWTTZ

发表年份
1993
引用次数
41

摘要

Abstract A hybrid method that combines human intelligence, an optimization technique (semi-Markov decision model) and an artificial neural network to solve real-time scheduling problems is proposed. The proposed method consists of three phases: data collection, optimization, and generalization. The testbed of this approach is the robot scheduling problem in a circuit board production line where one overhead robot is used to transport jobs through a line of sequential chemical process tanks. Because chemical processes are involved in this production system, any mistiming or misplacing will result in defective jobs. The proposed hybrid system performs better than the human scheduler from whom the models were formulated, both in terms of productivity and quality.

关键词

Production linePrinted circuit boardRobotScheduling (production processes)Computer scienceEngineeringManufacturing engineeringIndustrial engineeringArtificial intelligenceElectrical engineering

相关论文

查看 LEARNING 分类全部论文