Scheduling of Single-Arm Multi-cluster Tools With Wafer Residency Time Constraints in Semiconductor Manufacturing

QingHua Zhu, Naiqi Wu, Yan Qiao, MengChu Zhou

发表年份
2014
引用次数
66

摘要

This paper studies the challenging problem of scheduling single-arm multi-cluster tools with wafer residency time constraints. They have a linear topology and their bottleneck tool is process-bound. This work aims to find an optimal one-wafer cyclic schedule. With the Petri net model developed in our previous work and the minimal cycle time for a multicluster tool without wafer residency time constraints, it derives the necessary and sufficient schedulability conditions for multicluster tools with wafer residency time constraints for the first time. Then, it gives an algorithm to find an optimal one-wafer cyclic schedule if schedulable. This is done by simply setting the robots' waiting time for each tool. Thus, it is very computationally efficient and applicable to practical problems. An example is presented to illustrate the proposed method.

关键词

Semiconductor device fabricationBottleneckPetri netComputer scienceScheduling (production processes)WaferScheduleJob shop schedulingDistributed computingTurnaround time

相关论文

查看 OTHER 分类全部论文