Complexity Results for Flow-shop Scheduling Problems with Transportation Delays and a Single Robot
Ling Shi, Cheng Xue-guang
- Year
- 2011
- Citations
- 2
Abstract
The paper considers the problem of scheduling n jobs in a two-machine flow-shop to minimize the makespan. Between the completion of an operation and the beginning of the next operation of the same job, there is a time lag, which we refer to it as the transportation delays. All transportation delays have to be done by a single robot, which can perform at most one transportation at a time. New complexity results are derived for special case.
Keywords
Job shop schedulingFlow shop schedulingScheduling (production processes)Computer scienceRobotReal-time computingOperations researchMathematical optimizationEngineeringArtificial intelligence
Related papers
OTHER
📊 26,957 cites
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 cites
Artificial intelligence: a modern approach
1995
OTHER
Open access📊 20,501 cites
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 cites
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991