Two machine Flow shop with transportation time.
Mourad Boudhar, Nacira Chikhi
- Year
- 2011
- Citations
- 4
Abstract
We present a scheduling problem of the flow-shop type. We introduce a transportation system: robot or conveyor. This transportation system is also involved in machine loading and unloading. The studied workshop consists of two machines and a conveyor that must process a set of tasks. Tasks having just been executed wait for the conveyor to be transported. The objective is to determine a feasible schedule with minimal makespan. The general problem being NP-hard, we prove that two special cases of this problem are polynomially solvable. We also present heuristics for the solution of the general problem with numerical
Keywords
HeuristicsJob shop schedulingFlow shop schedulingComputer scienceScheduling (production processes)ScheduleMathematical optimizationProcess (computing)Transportation theorySet (abstract data type)
Related papers
OTHER
📊 26,957 cites
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 cites
Artificial intelligence: a modern approach
1995
OTHER
Open access📊 20,501 cites
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 cites
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991