A real-time, rule-based FMS operation control strategy in CIM environment–Part II
Paul G. Ranky
- Year
- 1988
- Citations
- 7
Abstract
Abstract After having summarised the FMS design rules and some of the most important FMS scheduling principles and algorithms in the first part of the paper (see IJCIM Vol. 1, No. 1, January 1988), in Part II all important details are given of the experimental implementation of an FMS dynamic loading sequencing and scheduling program. When developing this system the core concept was to shorten its run time to seconds, thus allowing real-time decision making just before a part is loaded onto the machine (or robot if used as a flexible assembly system scheduler).
Keywords
Scheduling (production processes)Flexible manufacturing systemComputer scienceReal-time Control SystemDynamic priority schedulingRule-based systemEngineeringControl engineeringControl (management)Industrial engineering
Related papers
OTHER
📊 26,957 cites
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
PERCEPTION
📊 22,245 cites
Artificial intelligence: a modern approach
1995
OTHER
Open access📊 20,501 cites
Fractional Differential Equations
Igor Podlubný
2025
OTHER
📊 18,993 cites
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991