Ordonnancement des ateliers de traitement de surface pour une production cyclique et mono-produit
Fabien Mangione
- 发表年份
- 2003
- 引用次数
- 4
摘要
In this thesis we study the automated electroplating lines. In these lines, the products are immerged in different tanks. Each tank contains baths, which affect the mechanical or electrical properties of the products. The parts are transferred from a tank to another one by a hoist. The processing times are bounded. The lower bound represents the minimum time to treat the product while the upper bound depends on the treatment.<br />A classical objective is to find the robot moves which maximize the throughput rate, this is called ”hoist scheduling problem” (HSP). In this thesis, we study the cyclic case. We proposed for a two-tanks line a method to obtain the optimal cycles. We proved, for a balanced three-tanks line and a single-part production, the caracteristics of the optimal cycles and a way to find them. Then we proposed the optimal cycles for the no-wait case in a four-tanks line. Finally we gave, for a balanced m-tanks line and a single part production, a conjecture which gives the structure of the optimal production cycles and proved it for several cases.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991
Genetic Programming: On the Programming of Computers by Means of Natural Selection
John R. Koza
1992