Automated material selection based on detected construction progress
Tyler Stephans, Austin D. McClymonds, Robert Leicht, Alan R. Wagner
- 发表年份
- 2022
- 引用次数
- 6
摘要
Automated material selection based on detected construction progress Tyler Stephans, Austin McClymonds, Robert Leicht and Alan Wagner Pages 406-413 (2022 Proceedings of the 39th ISARC, Bogotá, Colombia, ISBN 978-952-69524-2-0, ISSN 2413-5844) Abstract: One of the many ways in which automation may help the construction industry is on-site material management. This paper presents an automated process where materials are selected for staging by detecting construction progress from site images. The materials are then delivered to their re-spective workface locations by a robot. The effectiveness of the material selection process is assessed using a simulated and physical construction site. We demonstrate that our process is successful under a number of different conditions and environments. Our system contributes to the feasibility of autonomously managing materials on a construction site and reveals potential avenues for future research. Keywords: Automated material delivery; Progress detection; BIM; Robot DOI: https://doi.org/10.22260/ISARC2022/0056 Download fulltext Download BibTex Download Endnote (RIS) TeX Import to Mendeley
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991