首页 /研究 /Improved Charge Simulation Method for Overhaul Robot Energized Maintenance of Disconnect Switches
OTHER

Improved Charge Simulation Method for Overhaul Robot Energized Maintenance of Disconnect Switches

Wen‐Tong Chen, Jianbin Chang, Lin Feng, Honggang Song, Xue-Feng Wu

发表年份
2023
引用次数
2

摘要

The current traditional isolation switch overhaul robot powered overhaul method achieves the overhaul of substation equipment by constructing a fault diagnosis model, which leads to poor overhaul results due to the lack of calculation of the electric field strength of the working environment. In this regard, the disconnecting switch overhaul robot powered overhaul method with improved charge simulation method is proposed. The electric field strength of the working environment of the overhaul robot is calculated by constructing a three-dimensional substation space, and the mechanical structure and electrical control situation of the overhaul robot are designed according to the charge distribution inside the environment. In the experiment, the proposed overhaul method is verified, and the analysis of the experimental results shows that the proposed overhaul method is used to overhaul the faulty equipment in the substation, and the equipment fault identification error is small and has a more excellent overhaul effect.

关键词

RobotFault (geology)Reliability (semiconductor)EngineeringAutomotive engineeringField (mathematics)VoltageReliability engineeringComputer scienceElectrical engineering

相关论文

查看 OTHER 分类全部论文