Today’s World: Lean Manufacturing Environments and Cost Management
S. A. Rehman Khan
- 发表年份
- 2017
- 引用次数
- 3
- 访问权限
- 开放获取
摘要
This paper will help to identify the interrelationship factor of cost management in lean production system. Standard overhead costs are sum up of expected direct labor & machine hours. In-fact major problem of cost is not direct labor or material, but the cost allocation. Before direct labor was a huge expense for the organizations, but now usually all works is done by robots and electronics instruments, so direct labor cost is almost less than 8% of the total costs. But in opposite side overhead cost is higher than before because extensive usage of machineries. As shown in Table 1 and 2, any changes in a product mix can mislead and extra addition any other product costs, if direct labor saving took for product B, so product A will bear extra cost of overhead because of changes in product B, in-fact no changes in product A process. The most advanced level in the lean production is “Four Wall” Transfer to finished products and vendor receipts. The control requirements of four walls are: Continuous product flow, short lead time and few scrap.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991
Genetic Programming: On the Programming of Computers by Means of Natural Selection
John R. Koza
1992