Climbing Robot Cell For Fast And Flexible Manufacture Of Large Scale Structures
B. Bridge, Tariq Sattar, HE Leon-Rodriguez
- 发表年份
- 2006
- 引用次数
- 5
- 访问权限
- 开放获取
摘要
This paper describes the specification stages of a project which seeks to modernise and take into the future the technology\nof the manufacture of large fixed welded structures such as box girder bridges, storage tanks, ships and other steel\nfabrications which arise on construction sites, in large chemical and foodstuff plants, on offshore oil platforms etc,\nbringing the world of fast and flexible manufacturing to areas were construction is presently carried out by traditional use\nof manual labour, scaffolding and cranes and the inconvenient delivery by road of large factory prefabricated components.\nThe Project will achieve this by creating a transportable manufacturing cell (CROCELLS) consisting of a team of\ncooperating climbing robot work tools whose activities are coordinated and integrated through a central intelligence.\nUnlike factory based cells the robot work tools must be mobile and small so that they are able to climb over long distances, to great heights and over curved surfaces and surfaces with ridges or protusions such as nodal joints providing many technical robotics problems to be solved. Small robots have payload limitations but the essence of the cooperating robot concept is that large payloads of work tools can be achieved with small robots by distributing the payload over several robots. Each robot will be dedicated to a different task to optimise overall system performance, hence there could be be a surface profiler and navigator, welder, bolt and rivet placer, hot weld quality inspector, and cold weld inspector on separate platforms. The cell will be deployed through every stage of a product life cycle, during construction where the system will perform instant weld quality diagnostics and repairs, in service inspection and repair, and final lifetime assessment.\nThe CROCELLS concept is described in detail and system specifications are given which arise from an analysis of the\nindustrial problems to be solved in a first exploitation phase addressed to the business requirements of the end users in the\nproject. Then the hardware and software Architecture optimized for these specifications is presented for a prototype system presently under construction. Presently large fabrications on construction sites suffer from long fabrication times\nprescribed by traditional methods. The proposed mobile manufacturing cell will greatly reduce these times with economic benefits estimated at 630 M€ per annum in save time and 1956M€ per annum equipment sales taking EU export markets into account, with data for the global market being typically a factor of 4 higher
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Artificial intelligence: a modern approach
1995
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991