FutureHome: An integrated construction automation approach
Carlos Balaguer, Mohamed Abderrahim, J. M. Navarro, Samir Boudjabeur, P. Aromaa, Kalle Kähkönen, S. Slavenburg, Derek Seward, T. Bock, R. Wing, Brian Atkin
- 发表年份
- 2002
- 引用次数
- 54
摘要
This article presents the results of the FutureHome project, the first global project in the construction industry that introduces the ICA concept. The design, planning, and onsite robotization stages of house-building construction have been presented. The main advantage introduced by FutureHome is the integration of the three stages under common data and concept. The article focuses on the architectural design of residential houses and office buildings by using prefabricated modules. The design takes into account the prefabrication and onsite assembly. For efficient construction, a global planning strategy has been developed that integrates the prefabrication, transportation, and onsite processes. Finally, the robotized crane for the assembly of big 3-D modules with small tolerances is presented. The control strategy for adequate assembly with the reduction of positioning errors, rotation errors, and swinging of the modules, has been developed and tested.
关键词
相关论文
Statistical Learning Theory
Yuhai Wu, Vladimir Vapnik
1999
Fractional Differential Equations
Igor Podlubný
2025
Applied Nonlinear Control
Jean-Jacques Slotine, Weiping Li
1991
Genetic Programming: On the Programming of Computers by Means of Natural Selection
John R. Koza
1992